Recent projects by the team at Syngineering


Syngineering and EJ Work Together

Written on December 12, 2013

Syngineering and EJ have a great relationship, which enables both companies to collaborate to find solutions to a variety of different problems.

EJ required a lifting beam that could lift product from one stack to the next. The requirement of this job necessitated the design of a special lug which could rotate around the lifting beam, and lock into place by rotating the lug and locating it in a keyway along the length of the lifting beam.

 

concept 5th November

 

 

Above: A conceptual hand drawing on an envelope, to a 3D model showing the concept.

This concept was accepted and the fabrication of a prototype began.

IMG_0726

Above: Fabricated Prototype

From here, Syngineering awaits completion of the project, and is eager to hear any feedback to ensure that the final design suits EJ’s requirements perfectly.

Visit EJ’s website here, to see more.

← Back to News




Categories Industry News | Tags: