Seismic Detector Installation – Another Innovative Design by Syngineering
Saturday, September 3rd, 2016
Another innovative design project from Syngineering that eliminates many of the manual handling issues associated with installing Seismic Detectors. Eliminates all of the manual digging and back issues not to mention potential snake bites as they walk through long grass. This innovative design was developed and manufactured in Queensland, Australia and comes complete with RPEQ certification.
Click Here for more information
Contact Syngineering for details and support for either your Seismic test program or eliminating manual handling issues
P: +61 7 3865 6603
W: www.syngineering.com.au
E: info@syngineering.com.au
Category Case Study, Designs, General News | Tags: Tags: engineering design, exploration, health and safety, manual handling, Oil and Gas, oil and gas exploration, RPEQ certification, seismic, siesmic detector,